// added by JK:
// calculate if the user is able to see the pdf or not.
$requiredSubscription = (array)get_post_meta(get_the_ID(),'_required_capabilities', true);
$showPdf = !$requiredSubscription || (class_exists('swishu') && swishu::has_access_to_content(wp_get_single_post($_GET['id']))) || is_user_logged_in();
?>
NTT Munich 2 becomes DE-CIX enabled data centre
November 30, 2020
Analyst: Sacha Kavanagh
NTT GDC’s Munich 2 data centre in Germany will become a DE-CIX enabled site.