Xiolink expands St. Louis data centre (update)
We followed up with Xiolink and the power in the upgraded facility at 1111 Vine Street in St. Louis is 5kw per rack with the capacity for increases.
or
We followed up with Xiolink and the power in the upgraded facility at 1111 Vine Street in St. Louis is 5kw per rack with the capacity for increases.
or