is-2023_horizontal-white_new
October 15-16, 2025 The Wynn Las Vegas, NV More information

Bloom Energy partners with CoreWeave for on-site generation at Chirisa data centre near Chicago

  • July 29, 2024
  • Analyst: Philbert Shih

loom Energy partnered with GPU cloud provider CoreWeave to enable on-site power generation at a data centre location outside Chicago that CoreWeave will deploy its infrastructure in.

or